Emergency Evacuation Plan Template
1. Introduction
An Emergency Evacuation Plan (EEP) is a structured document that outlines procedures to safely evacuate people from a workplace or facility during emergencies such as fires, explosions, natural disasters, hazardous material spills, or security threats.
Having a documented and well-practiced evacuation plan is not only a legal requirement in many countries but also a critical element of workplace safety management. The primary goal of an evacuation plan is to save lives by ensuring that all individuals know how to act quickly and safely.
2. Purpose of the Plan
The purpose of this Emergency Evacuation Plan is to:
- Protect employees, visitors, and contractors in the event of an emergency.
- Provide clear instructions for evacuation procedures.
- Assign roles and responsibilities to trained personnel.
- Ensure compliance with occupational safety regulations (e.g., OSHA, ISO 45001).
- Reduce panic and confusion during emergencies.
3. Scope
This plan applies to:
- All employees (full-time, part-time, and temporary staff)
- Visitors and contractors on-site
- All departments, floors, and facilities covered by the organization
4. Types of Emergencies Covered
This plan is applicable to the following scenarios:
- Fire and Explosion
- Chemical Spills / Hazardous Material Releases
- Gas Leaks
- Natural Disasters (Earthquake, Flood, Storm)
- Security Threats (Bomb threat, active shooter)
- Structural Failures (Building collapse risk)
5. Roles & Responsibilities
5.1 Emergency Coordinator
- Oversees the entire evacuation process.
- Coordinates with emergency services.
- Ensures the plan is up-to-date.
5.2 Floor/Area Wardens
- Direct occupants to the nearest safe exit.
- Check all rooms, restrooms, and isolated areas.
- Report any missing persons to the Emergency Coordinator.
5.3 First Aiders
- Provide first aid to injured persons.
- Assist in transporting individuals with mobility impairments.
5.4 Security Personnel
- Secure the facility post-evacuation.
- Guide emergency responders to the incident location.
5.5 Employees
- Follow evacuation instructions calmly.
- Proceed to designated assembly points.
- Do not return until clearance is given.
6. Evacuation Procedures
6.1 Before an Emergency
- Conduct regular drills.
- Maintain clear and marked evacuation routes.
- Ensure all fire alarms and emergency lighting are functional.
6.2 During an Emergency
- Activate the nearest fire alarm or emergency notification system.
- Stop all work and leave immediately via the nearest safe exit.
- Do not use elevators unless instructed by emergency personnel.
- Follow exit signs to reach assembly areas.
- Wardens ensure all persons have left their areas.
6.3 After Evacuation
- Report to the Assembly Point Leader.
- Participate in a headcount to ensure everyone is accounted for.
- Remain at the assembly point until given all-clear.
7. Evacuation Routes & Assembly Points
- Evacuation maps should be displayed at all key points.
- Clearly mark primary and secondary exits.
- Assign assembly areas at a safe distance from the building.
8. Special Provisions
- Persons with Disabilities: Assign helpers for mobility, vision, or hearing assistance.
- Visitors and Contractors: Must be briefed on evacuation routes upon arrival.
- High-Risk Areas: Additional precautions for chemical storage, welding zones, etc.
9. Communication Protocols
- Alarm Systems: Audible and visual alarms.
- Public Address System: Used for specific evacuation instructions.
- Two-Way Radios: For coordination between wardens and security.
10. Training & Drills
- Conduct at least two evacuation drills per year.
- Train wardens and first aiders in their roles.
- Record drill outcomes and improve weak areas.
11. Post-Evacuation Actions
- Complete an Incident Report.
- Investigate causes and review the effectiveness of the plan.
- Update the evacuation plan based on lessons learned.
12. Emergency Evacuation Plan Template (Editable Format)
| Section | Details |
|---|---|
| Organization Name | |
| Address | |
| Emergency Coordinator | Name, Contact No. |
| Fire Wardens | Names, Departments |
| First Aiders | Names, Departments |
| Emergency Contact Numbers | Fire Dept., Ambulance, Police |
| Primary Evacuation Routes | |
| Secondary Evacuation Routes | |
| Assembly Points | |
| Special Provisions for Disabled Persons | |
| Alarm System Type | |
| Last Drill Date | |
| Next Scheduled Drill |
13. Example – Completed Plan
Organization Name: XYZ Manufacturing Pvt. Ltd.
Address: Plot No. 15, Industrial Area, Mumbai, India
Emergency Coordinator: Mr. Rajesh Sharma – +91-9876543210
Fire Wardens:
- Amit Kumar (Production) – +91-9123456789
- Neha Singh (Admin) – +91-9123456790
First Aiders:
- Ramesh Iyer (Maintenance) – +91-9123456791
- Sunita Patil (HR) – +91-9123456792
Emergency Contact Numbers:
- Fire Brigade: 101
- Ambulance: 108
- Police: 100
Primary Evacuation Route: East Gate → Parking Lot → Assembly Point A
Secondary Evacuation Route: South Exit → Service Road → Assembly Point B
Assembly Points:
- Point A: Main Parking Lot (100m from building)
- Point B: South Field (150m from building)
Special Provisions: Two wheelchairs kept at reception; assigned assistants for mobility-impaired staff.
Alarm System: Addressable Fire Alarm with strobe lights.
Last Drill Date: 15 March 2025
Next Scheduled Drill: 10 September 2025
14. Legal Compliance & References
- OSHA 1910.38 – Emergency Action Plans
- NFPA 101 – Life Safety Code
- ISO 45001 – Occupational Health & Safety Management
15. Key Tips for Effective Implementation
- Keep the plan simple and visible.
- Use color-coded evacuation maps.
- Train new employees within their first week.
- Review and update the plan annually.
- Conduct surprise drills to simulate real emergencies.
Emergency Evacuation Plan – Detailed Checklist Format
Purpose:
This checklist ensures that all critical elements of an Emergency Evacuation Plan (EEP) are addressed, implemented, and reviewed regularly.
1. General Information
| Item | Yes/No | Remarks |
|---|---|---|
| Emergency evacuation plan is documented and up-to-date | ☐ | |
| Plan covers all facility areas and operations | ☐ | |
| Plan is reviewed and updated annually or after major changes | ☐ | |
| Emergency contact list is current and displayed | ☐ |
2. Risk Assessment & Hazard Identification
| Item | Yes/No | Remarks |
|---|---|---|
| Potential fire hazards identified and mitigated | ☐ | |
| Chemical spill/HAZMAT hazards addressed | ☐ | |
| Flood, earthquake, or other natural disaster risks identified | ☐ | |
| Security threats (e.g., active shooter, intrusion) assessed | ☐ |
3. Roles and Responsibilities
| Item | Yes/No | Remarks |
|---|---|---|
| Emergency Coordinator appointed | ☐ | |
| Floor Wardens assigned for each area | ☐ | |
| First Aid Responders designated | ☐ | |
| All emergency roles documented and known to staff | ☐ |
4. Evacuation Routes and Exits
| Item | Yes/No | Remarks |
|---|---|---|
| Primary and secondary evacuation routes clearly marked | ☐ | |
| Emergency exits free of obstructions | ☐ | |
| Exit doors open in the direction of travel | ☐ | |
| Evacuation maps posted at visible locations | ☐ |
5. Assembly Areas
| Item | Yes/No | Remarks |
|---|---|---|
| Safe assembly areas designated outside facility | ☐ | |
| Area is large enough to accommodate all personnel | ☐ | |
| Assembly area is away from hazards (e.g., fire, traffic) | ☐ | |
| Area signage and route directions are clear | ☐ |
6. Emergency Communication Systems
| Item | Yes/No | Remarks |
|---|---|---|
| Alarm systems installed and functional | ☐ | |
| Public address system tested regularly | ☐ | |
| Staff trained on communication protocols | ☐ | |
| Backup communication methods available (e.g., radios) | ☐ |
7. Special Provisions for Vulnerable Persons
| Item | Yes/No | Remarks |
|---|---|---|
| Assistance plans for persons with disabilities | ☐ | |
| Designated helpers assigned for each vulnerable person | ☐ | |
| Evacuation equipment available (wheelchairs, evac chairs) | ☐ |
8. Training and Drills
| Item | Yes/No | Remarks |
|---|---|---|
| Evacuation drills conducted at least twice a year | ☐ | |
| New employees trained during induction | ☐ | |
| Training records maintained | ☐ | |
| Post-drill reviews conducted and improvements made | ☐ |
9. Post-Evacuation Accountability
| Item | Yes/No | Remarks |
|---|---|---|
| Roll call procedures in place | ☐ | |
| Missing persons reporting system established | ☐ | |
| Incident report forms available | ☐ |
10. Continuous Improvement
| Item | Yes/No | Remarks |
|---|---|---|
| Lessons learned from drills incorporated into plan | ☐ | |
| Feedback from employees considered | ☐ | |
| Plan improvement documented | ☐ |
Safety Audit Checklist Template – A Complete Guide for Effective Workplace Inspections
Job Safety Analysis (JSA) Template – Free Download & Step-by-Step Guide
Free Hot Work Permit Template for Fire Risk Control | Download Now
Free Safety Inspection Checklist Template for Daily Site Audits | Download Now